Project Description:
The multi-phase ‘Renaissance Project’ entails renovating the emergency services facility, creating a new eight-story patient bed tower, and connecting the new facilities with the existing ones.
Provided:
• BIM Modeling
• 3D Coordination
• Installation Drawings for Pneumatic Tubing Contractor
• Weekly On-Site Meeting Attendance to Coordinate with Other Trades
Size: 500,000 sf | 46.452 m2
Location: Toledo, OH
General Contractor: Turner Construction
Client: Swisslog