Wellington Regional Medical Center

Project Description:

The project consists of a hospital extension where three new floors were added adjacent to the existing building. The project requires coordination of MEP services to eliminate problems/clashes between the various disciplines and reduce time and wastage onsite during construction.

Provided:

• BIM Modeling

• 3D Coordination

• Clash Detection

• Hanger Layouts

• Fabrication Drawings for HVAC, Hydronic, Electrical, Plumbing, and Medical Gas Systems

Size: 105,000 sf | 9.755 m2

Location: Wellington, FL

Client: Confidential