Chat with us, powered by LiveChat

Yacyretá Hydroelectric Power Plant

Project Description:
The dam is 2,651 ft long, has a maximum power output of 3,100 mega-watts (4,200,000 hp), with a record maximum annual power output of 20.091 TWh (72.33 PJ)

Slider image
Slider image
Slider image

Services Provided:

  • As-Built REVIT Modeling of Concrete Structures, Piping, Equipment and Electrical for Operations purposes
  • Implementation of YouBIM Software (BIM for FM) – IBM Maximo Integration

Location: Argentina | Client: Confidential


Contact Us










FAQ about BIM

What is BIM? What are some of the uses of BIM? And the benefits? Here we respond to these and more questions…

Read More